Resolving the “Trouble” With RTUs

PB-53-NovaTech-LegacyRTU-400.jpg

January 10, 2022

At utility substations, Remote Terminal Units (RTUs) are critical components used for monitoring circuit breaker positions, alarms, voltages/currents, temperatures, and additional data from a variety of wired sensors. They can also control breakers, tap changers, and capacitor banks. However, for many utilities, RTUs remain a trouble spot. As RTUs age, reliability issues, unforgiving software, lack of vendor support for older product lines, increased training time, and diminishing availability of replacement parts can make RTUs an ongoing and time-consuming task for substation technicians.

“I get more trouble calls related to RTUs than I should,” says the senior supervisor at a Fortune 500 electric and natural gas utility serving the power needs of seven states in the Midwest. “What I need is for my RTUs to work reliably because my field engineering team doesn’t have the time to keep coming back to resolve trouble calls and investigate why an RTU isn’t functioning properly or stopped working.”

Despite utilizing RTUs from several known providers, the reliability issues became so frequent that the engineering team decided the best course of action was to start upgrading all the RTUs across their entire network.

“Some of our RTUs started having software and hardware failures,” says their senior supervisor. “They were not very old, maybe ten years. We had one unit where the screen froze up, and the software and the configuration were corrupted. The RTU vendor told us the only thing we could do was to rebuild the database, which we did completely.”

While the engineering team had the knowledge and experience to resolve the issues, it was another task for already thin resources. The team at the utility already has extensive responsibilities that go beyond substation installation to include programming and telecommunication systems. “We manage basically everything that goes from the main control center all the way to the handoff at the end device in the substation,” he adds.

Contributing to their RTU replacement decision was the fact that another one of their RTU vendors announced they would no longer support their existing software. The outcome was going to require the utility to replace the software and train the team. “The training for the new software was going to cost $30,000 for one week of in-person training,” says the senior supervisor.

PB-53-NovaTech-RTUEngineer-400.jpg

As a result, they started to explore other options on the market. This led them to an RTU manufacturer that sold them on the promise of a newly redesigned platform. The vendor brought in a new RTU for an initial test.  “It just didn’t work,” says the senior supervisor. “For an installation job that was supposed to take about two and a half hours, we ended up putting the old RTU back in thirteen hours later because the vendor could not get the replacement unit running.”

The disappointing experience increased the scrutiny of the claims made by other RTU vendors. At this time, utility personnel began discussions with Pennsylvania-based, NovaTech Automation, a leading substation automation provider. The company offered its OrionLX automation platform as an RTU replacement. Configuration of the NovaTech OrionLX-based RTU, including the I/O system, the Alarm Tile Annunciator, Math & Logic routines, and IED data access, is accomplished through NovaTech Configuration Director, a license-free tool used for Orion models. NCD eliminates most configuration efforts by providing pre-configured pick lists for over 250 commonly applied intelligent electronic devices (IEDs).

After testing to fully validate the new RTUs, the utility chose to replace their existing units with the NovaTech Orion line (LX, LX+, LXm, and now Orion I/O) together with the company’s Distributed Discrete I/O (DDIO) and Combination I/O (DCIO) modules and advanced I/O’s.   

As part of the project, NovaTech worked with the utility to custom build and configure an OrionLX unit to function identically to one of the brands of RTUs they were replacing.

The team used the NovaTech Configuration Director to configure the new RTU to essentially mirror the performance of the units they were replacing, including communicating using the competitor’s proprietary protocol. The replacement units have the same number of serial ports, so installing the unit only required plugging the serial cables into the corresponding port number on the new OrionLX once the configuration was completed.

“The wiring requirement was minimal, so it was as close to plug-and-play as you could ask for and the unit came online quickly and worked as expected,” says the senior supervisor, adding that the utility has now replaced all six of their units in this manner.

retrofit_solution_for_d20_combination_card.jpg

As for the RTUs with the software that was no longer being supported, the utility is currently phasing out all those units as well.

“We still have probably a dozen of those left,” said the senior supervisor. “In the next few years, we will have completely converted over to the new RTUs across our entire system.”

He adds that early in the NovaTech RTU evaluation, one issue did arise when lightning struck a couple of the new units. According to the senior supervisor, “the lightning blew them apart. We received an alarm from the unit saying the power supply was dead and needed to be replaced, but we were running a redundant power supply, and the Orion units remained online and functional.”

Ease of training and maintenance

In addition to improving reliability and performance, the utility also sought a solution that eliminated the other “trouble” associated with RTUs: the training time required for technicians to program and install the new units. In this regard, the NovaTech RTUs were “technician friendly,” and training time was minimal.

“I was able to take apprentices and show them how the software works,” says the senior supervisor. “After an hour, they were able to take an assignment sheet with all the items needed and program the RTU. That doesn’t mean they have a full understanding of everything the unit is doing yet, but they can program it.”

Ease of maintenance figures highly too. “It probably took me a year to figure out all the little bugs about the software of our prior RTUs. It was very unforgiving,” said the senior supervisor. “Troubleshooting required going through multiple tables and layers. The RTU would not indicate why it was offline, only that it was offline. What we appreciate about the new RTUs is you can review the error log to diagnose the specific problem that is occurring.

Based on the positive experiences to date, the utility continues with its rollout of replacement RTUs. Other utilities have contacted them to understand how they addressed issues with an RTU conversion.

“I’m glad I didn’t resist change when we were considering replacing the RTU units that were causing us trouble,” says the senior supervisor. “With our confidence in the reliability of our new RTUs, and standardizing on solutions from a single provider, our engineering team is able to focus on improving our network infrastructure in other ways without being constantly drawn back to performance issues.”

For more information, visit HERE.

Related Articles


Changing Scene


Sponsored Content
The Easy Way to the Industrial IoT

The way to the Industrial IoT does not have to be complicated. Whether access to valuable data is required or new, data-driven services are to be generated, Weidmuller enables its customers to go from data to value the easy way. Weidmuller’s comprehensive and cutting-edge IIoT portfolio applies to greenfield and brownfield applications. Weidmuller offers components and solutions from data acquisition, data pre-processing, data communication and data analysis.

Visit Weidmuller’s Industrial IoT Portfolio.


ADVANCED Motion Controls Takes Servo Drives to New Heights (and Depths) with FlexPro Extended Environment Product Line

Advanced Motion Controls is proud to announce the addition of six new CANopen servo drives with Extended Environment capabilities to their FlexPro line. These new drives join AMC’s existing EtherCAT Extended Environment FlexPro drives, making the FlexPro line the go-to solution for motion control applications in harsh environments.

Many motion control applications take place in conditions that are less than ideal, such as extreme temperatures, high and low pressures, shocks and vibrations, and contamination. Electronics, including servo drives, can malfunction or sustain permanent damage in these conditions.

Read More


Service Wire Co. Announces New Titles for Key Executives

Bruce Kesler and Mark Gatewood have been given new titles and responsibilities for Service Wire Co.

Bruce Kesler has assumed the role of Senior Director – Business Development. Bruce will be responsible for Service Wire’s largest strategic accounts and our growing Strategic Accounts Team.

Mark Gatewood has been promoted to the role of Vice President – Sales & Marketing. In this role, Gatewood will lead the efforts of Service Wire Company’s entire sales and marketing organization in all market verticals.

Read More


Tri-Mach Announces the Purchase of an Additional 45,000 sq ft. Facility

Tri-Mach Elmira Facility

Recently, Tri-Mach Inc. was thrilled to announce the addition of a new 45,000 sq ft. facility. Located at 285 Union St., Elmira, ON, this facility expands Tri-Mach’s capabilities, allowing them to better serve the growing needs of their customers.

Positioning for growth, this additional facility will allow Tri-Mach to continue taking on large-scale projects, enhance product performance testing, and provide equipment storage for their customers. The building will also be the new home to their Skilled Trades Centre of Excellence.

Read More


JMP Parent Company, CONVERGIX Acquires AGR Automation, Expanding Global Reach

Convergix Automation Solutions has completed the acquisition of AGR Automation (“AGR”), a UK-based provider of custom, high-performance automation design and systems integration primarily to the life sciences industry.

Following Convergix’s acquisitions of JMP Solutions in August 2021 and Classic Design in February 2022, AGR marks the third investment in Crestview’s strategy to build Convergix into a diversified automation solutions provider targeting the global $500+ billion market, with a particular focus on the $70 billion global systems integration and connectivity segments. Financial terms of the transaction were not disclosed.

Read More


Latest Articles

  • Implementing Functional Safety Requirements

    Implementing Functional Safety Requirements

    The Safety Functional Requirements Specification (SFRS; sometimes referred to as SRS or Safety Requirements Specification) is the plan for the safety controls on a machine and is the second step of the safety lifecycle. The SFRS document serves as a framework for the safety control system design, is informed by prior work done in the… Read More…

  • From Endress+Hauser, 24/7 Digital, Plant-Wide Health Monitoring for Rockwell Systems Optimizes Workflows and Processes

    From Endress+Hauser, 24/7 Digital, Plant-Wide Health Monitoring for Rockwell Systems Optimizes Workflows and Processes

    Endress+Hauser’s Asset Health Monitoring Solution–Rockwell Edition, now available for installation, provides operators with a centralized, digital overview of plant-wide device health to avoid unscheduled shutdowns and accelerate troubleshooting. It not only presents early visibility of problematic devices but distinguishes itself by adding likely causes and remedies to such a report so problems can be fixed… Read More…