ESA Guidance Regarding Inspections During the Pandemic

EIN 24 ESA 400

May 25, 2020

ESA’s response team has been working diligently to address the emerging issues. We are moving into circumstances that will require us to focus on the highest safety and related priorities of the province, while protecting our staff and the public.

The following is based on the latest public health guidelines and recommendations.

Priorities for Inspections

1. Emergency and public safety infrastructure equipment.

o This includes electrical work for in-home medical equipment installed to release capacity in the hospitals for the expected influx of COVID19 patients

2. ESA will give priority to workplaces included on the Essential Business List, however, will not enter occupied areas of the following facilities due to the vulnerable nature of these populations, except for critical or emergency services as approved by the ESA General Manager and/or Senior Inspector.

o Long Term Care Homes and Seniors residences

o Hospitals

o Retirement Homes

o Day Care facilities

o Community Housing for non-critical routine inspections

3. Connection authorizations, organized through Licensed Electrical Contractors so people can receive electrical service from their Local Distribution Company

4. Disconnect and Holds, organized by Licensed Electrical Contractors and known in the industry as a “Disconnect and Hold”. This will allow Local Distribution companies to facilitate service upgrades, emergency panel changes and service repairs

Remote assessment/inspection

1. Remote assessment/inspection are the alternate means of fieldwork when a site visit cannot be made safely.

2. At the Inspector’s discretion, they will use a wide range of options and discretion to both allow business to continue, exercise their authority and conduct inspections in the coming days and weeks

o Pass without a visit as directed and guided by our Best Business Practices

o Sampling tools in ACP, and the soon to be implemented RBO

o Photos

Videos – live or recorded

o Instead of visiting a facility or dwelling, our Inspector meet the LEC performing the work at a safe location to review pictures, videos and any other available evidence to give the Inspector comfort regarding the state of electrical safety for the site or installation

o When entering an installation, only view or access the areas needed to complete the notification. Touch as little as possible and maintain a safe social distance

o If an inspector is unable to physically view an installation but has accepted pictures, videos or other evidence, they will record what was accepted or what they were/were not able to view in the notification comments, preceded with “COVID19”

3. Access Arranged appointments – ESA will notify these customers/clients directly that dedicated appointments will not be available and the Inspector will visit sometime through the day, provided the site does meet the exclusions set out below

Inspections in Homes for work by both Contractors and Non-Contractors:

  •   –  Low exposure work such as exterior visits, garages, sheds, and unoccupied spaces can continue in-person with minimal additional safety protocol.
  •   –  If visits in residential dwellings can be delayed, they should be.
  •   –  If a visit in a residential dwelling cannot be delayed, the Inspector will conduct a risk assessment prior to entry, and utilize the necessary Personal Protective Equipment (PPE)


Criteria for in-person residential visits:

  •   –  Alternative methods of inspection review have been considered and no other method can be used to ensure we are meeting our regulatory requirements. i.e video, phone, phone consultation, off peak hours etc.
  •   –  Inspector and homeowner/tenant have no underlying health conditions or concerns that place them at higher risk.
  •   –  In order to minimize contact with surfaces in the home, the homeowner/tenant/contractor should be prepared to open doors, turn on lights, provide access to areas where electrical work has been done etc.


Requirements for in-person residential visits:

  •   –  The interior of occupied residential dwellings should be vacated for 2 hours, if at all possible. This is for both the health and safety of employees and public/occupants. The time frame is to allow airborne particles to settle on surfaces, and less likelihood of respiratory ingestion.
  •   –  Where it is not practical to delay work, and where the inspector must enter the interior of a dwelling:


o The Inspector will arrange an access time with the homeowner/tenant/contractor

o The inspector will call the customer prior to arrival to enquire if anyone on the premises is unwell. If someone is unwell, and the inspector agrees that the visit cannot be delayed, then adequate PPE will be worn and Health and Safety protocols followed as dictated by the risk assessment

  •   –  The contact person should be informed in advance that any PPE worn at the site will be left at the site for disposal by the site contact. The used PPE will be left in a bag at site, for disposal by the Homeowner/tenant/contractor.
  •   –  The Inspector will perform as much of the pre-work consultation as possible before arriving on a customer site (e.g.) have the homeowner/Tenant/Contractor send pictures or more detailed information than usual/customary. This will ensure that the Inspector’s time on-site is kept to a minimum.
  •   –  Inspectors will perform their duties while maintaining at least 2 metres or 6 feet distance from other people. This may include asking homeowners/tenants/contractors to move to a room with a closed door or another area of the residence while work is being completed.
  •   –  To minimize contact with surfaces in the home, homeowners/tenants/contractors to open doors and turn on lights before the inspector enters to work.
  •   –  If at any time during a field visit an inspector notices anything that concerns them with respect to COVID-19 (i.e. such as persons that appear to be unwell, recent travel outside of the country, the occupancy type and number of occupants appears to be such that physical distance is not adequate) the inspector will discontinue the visit


Training, Exams and events

  •   –  ESA staff will not be attending external meetings of large groups
  •   –  All Training Sessions and all Master Exams are postponed until further notice.

Technical Advisors are available to assist with answers to technical questions, code interpretations, as well as assistance with concerns over of any video or picture. These steps are taken both to protect the residents of those facilities, as well as our staff from unnecessary exposure. As always, everyone is encouraged to continue proper use of hand and personal hygiene and use of personal protective equipment as instructed by site risk assessments.

Go HERE for information on how homeowners can prepare for inspections

Source

Related Articles


Changing Scene


Sponsored Content
The Easy Way to the Industrial IoT

The way to the Industrial IoT does not have to be complicated. Whether access to valuable data is required or new, data-driven services are to be generated, Weidmuller enables its customers to go from data to value the easy way. Weidmuller’s comprehensive and cutting-edge IIoT portfolio applies to greenfield and brownfield applications. Weidmuller offers components and solutions from data acquisition, data pre-processing, data communication and data analysis.

Visit Weidmuller’s Industrial IoT Portfolio.


ADVANCED Motion Controls Takes Servo Drives to New Heights (and Depths) with FlexPro Extended Environment Product Line

Advanced Motion Controls is proud to announce the addition of six new CANopen servo drives with Extended Environment capabilities to their FlexPro line. These new drives join AMC’s existing EtherCAT Extended Environment FlexPro drives, making the FlexPro line the go-to solution for motion control applications in harsh environments.

Many motion control applications take place in conditions that are less than ideal, such as extreme temperatures, high and low pressures, shocks and vibrations, and contamination. Electronics, including servo drives, can malfunction or sustain permanent damage in these conditions.

Read More


Service Wire Co. Announces New Titles for Key Executives

Bruce Kesler and Mark Gatewood have been given new titles and responsibilities for Service Wire Co.

Bruce Kesler has assumed the role of Senior Director – Business Development. Bruce will be responsible for Service Wire’s largest strategic accounts and our growing Strategic Accounts Team.

Mark Gatewood has been promoted to the role of Vice President – Sales & Marketing. In this role, Gatewood will lead the efforts of Service Wire Company’s entire sales and marketing organization in all market verticals.

Read More


Tri-Mach Announces the Purchase of an Additional 45,000 sq ft. Facility

Tri-Mach Elmira Facility

Recently, Tri-Mach Inc. was thrilled to announce the addition of a new 45,000 sq ft. facility. Located at 285 Union St., Elmira, ON, this facility expands Tri-Mach’s capabilities, allowing them to better serve the growing needs of their customers.

Positioning for growth, this additional facility will allow Tri-Mach to continue taking on large-scale projects, enhance product performance testing, and provide equipment storage for their customers. The building will also be the new home to their Skilled Trades Centre of Excellence.

Read More


JMP Parent Company, CONVERGIX Acquires AGR Automation, Expanding Global Reach

Convergix Automation Solutions has completed the acquisition of AGR Automation (“AGR”), a UK-based provider of custom, high-performance automation design and systems integration primarily to the life sciences industry.

Following Convergix’s acquisitions of JMP Solutions in August 2021 and Classic Design in February 2022, AGR marks the third investment in Crestview’s strategy to build Convergix into a diversified automation solutions provider targeting the global $500+ billion market, with a particular focus on the $70 billion global systems integration and connectivity segments. Financial terms of the transaction were not disclosed.

Read More


Latest Articles

  • Implementing Functional Safety Requirements

    Implementing Functional Safety Requirements

    The Safety Functional Requirements Specification (SFRS; sometimes referred to as SRS or Safety Requirements Specification) is the plan for the safety controls on a machine and is the second step of the safety lifecycle. The SFRS document serves as a framework for the safety control system design, is informed by prior work done in the… Read More…

  • From Endress+Hauser, 24/7 Digital, Plant-Wide Health Monitoring for Rockwell Systems Optimizes Workflows and Processes

    From Endress+Hauser, 24/7 Digital, Plant-Wide Health Monitoring for Rockwell Systems Optimizes Workflows and Processes

    Endress+Hauser’s Asset Health Monitoring Solution–Rockwell Edition, now available for installation, provides operators with a centralized, digital overview of plant-wide device health to avoid unscheduled shutdowns and accelerate troubleshooting. It not only presents early visibility of problematic devices but distinguishes itself by adding likely causes and remedies to such a report so problems can be fixed… Read More…